GPM First
From Management Science, Operations Research and Project Management (978-1-4724-2643-7) by José Ramón San Cristóbal Mateo

References

 

1 

Abdul-Raman, H., Yahya, I.A., Berawi, M.A., and Wah, L.W. 2008. Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), 15–27.

2 

AbouRizk, S. 2010. Role of simulation in construction engineering and management. Journal of Construction Engineering and Management, 136(10), 1140–53.

3 

Ackoff, R.L. 1970. A Concept of Corporate Planning. New York: Wiley.

4 

Ahmad, I. and Minkarah, I. 1990. Decision analysis and expert system technology: A construction industry perspective. Proc., Int. Sym. On Building Economics and Construction Management, CIB, Sydney, Australia, 363–372.

5 

Aibinu, A.A. and Jagboro, G.O. 2002. The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20, 593–99.

6 

Aibinu, A.A. and Odeyinka, H.A. 2005. Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132, 667–77.

7 

Alaghbari, W., Kadir, M.R.A., Salim, A., and Ernawati. A. 2007. The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206.

8 

Al-Gahtani, K.S. 2009. Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135, 88–95.

9 

Al-Subhi Al-Harbi, K. 2001. Application of the AHP in project management. International Journal of Project Management, 19, 19–27.

10 

Amiri, M. and Golozari, F. 2011. Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk and quality criteria. International Journal of Advanced Manufacturing Technology, 54(1–4), 393–401.

11 

Ang, A.H. and Tang, W.H. 1975. Probability Concepts in Engineering and Design. New York: John Wiley & Sons.

12 

Association for Project Management (APM). 2006. Body of Knowledge, 5th ed. High Wycombe: Project Management Institute.

13 

Azaron, A. and Tavakkoli-Moghaddam, R. 2006. A multi-objective resource allocation problem in dynamic PERT networks. Applied Mathematics and Computation, 181(1), 163–74.

14 

Barraza, G.A., Back, W.E., and Mata, F. 2000. Probabilistic monitoring of project performance using S-curves. Journal of Construction Engineering and Management, 126(2), 142–48.

15 

Barraza, G.A., Back, W.E., and Mata, F. 2004. Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), 25–32.

16 

Bein, W.W., Kamburowski, J., and Stallmann, M.F.M. 1992. Optimal reduction of two-terminal directed acyclic graphs. SLAM Journal of Computing, 21, 1112–29.

17 

Bell, D.V., Keeney, R., and Raiffa, H. 1978. Conflicting Objectives in Decisions. New York: International Institute for Applied Systems Analysis.

18 

Bellas, C.J. and Samli, A.C. 1973. Improving new product planning with GERT simulation. California Management Review, 15(4), 14–21.

19 

Bergantinos, G. and Sanchez, E. 2002a. How to distribute costs associated with a delayed project. Annals of Operations Research, 109, 159–74.

20 

Bergantinos, G. and Sanchez, E. 2002b. NTU PERT Games. Operations Research Letters, 30, 130–40.

21 

Berny. J. and Howes, R. 1982. Project management control using real-time budgeting and forecasting models. Construction Papers, 2(1), 19–40.

22 

Blyth, K. and Kaka, A. 2006. A novel multiple linear regression model for forecasting S-curves. Engineering, Construction, and Architectural Management, 13(1), 82–95.

23 

Brans, J.P. 1982. L’ingénierie de la décision: élaboration d›instruments d’aide à la décision. Le méthode PROMETHEE. Colloque d’aide à la decision. Quebec, 183–213.

24 

Brans, J.P. and Vincke, P.H. 1985. A preference ranking organization method: The PROMETHEE method for multiple-criteria decision-making. Management Science, 31(6), 647–56.

25 

Branzei, R., Ferrari, G., Fragnelli, V., and Tijs, S. 2002. Fuzzy temporal characteristics of operations for project management on the network models basis. Annals of Operational Research, 109, 359–74.

26 

British Standard (BS 6079-1). 2002. Guide to Project Management. London: British Standards Institutions.

27 

Bromilow, F.J. 1974. Measurement and scheduling of construction time and cost performance in the building industry. The Chartered Builder, 10(9), 189–96.

28 

Butcher, W.S. 1967. Dynamic programming for project cost-time curves. Journal of the Construction Division, Proceedings of the ASCE, 93, 59–73.

29 

Cagno, E., Caron, F., and Perego, A. 2001. Multi-criteria assessment of the probability of winning in the competitive bidding process. International Journal of Project Management, 19(6), 313–24.

30 

Castelaz, P., Angus, J., and Mahoney, J. 1987. Appliction of neural networks to expert systems and command and control systems. Proc., IEEE Western Conference on Expert Systems, 118–125.

31 

Castro, J., Gómez, D. and Tejada, J. 2012. A project game for PERT networks. Operations Research Letters, 35, 791–98.

32 

Chan, A.P.C. 1999. Modeling building durations in Hong Kong. Construction Management and Economics, 17(2), 189–96.

33 

Chanas, S. and Zielinski, P. 2003. On the hardness of evaluating criticality of activities in a planar network with duration intervals. Operations Research Letters, 31, 53–59.

34 

Chanas, S., Dubois, D., and Zielinski, P. 2002. On the sure criticality of tasks in activity networks with imprecise durations. IEEE Transactions on Systems, Man and Cybernetics, Part B, 32, 393–407.

35 

Chao, L.C. and Chien, C.F. 2009. Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), 169–77.

36 

Chao, L.C. and Skibniewski, J.M. 1994. Estimating construction productivity: Neural-network-based approach. Journal of Computing and Civil Engineering, 8(2), 234–51.

37 

Charnes, A. and Cooper, W.W. 1962. A network interpretation and a directed subdual algorithm for critical path scheduling. Journal of Industrial Engineering, 13(4), 213–19.

38 

Chen, H.L., Chen, C.I., Liu, C.H., and Wei, N.C. 2013. Estimating a project’s profitability: A longitudinal approach. International Journal of Project Management, 31, 400–10.

39 

Chen, S.F. 2007. Analysis of critical paths in a project network with fuzzy activity times. European Journal of Operations Research, 183, 442–59.

40 

Chen, S.P. and Hsueh, Y.J. 2008. A simple approach to fuzzy critical path analysis in project networks. Applied Mathematical. Modeling, 32, 1289–97.

41 

Cheng, E.W.L. and Li, H. 2004. Contractor selection using the analytical network process. Construction Management and Economics, 22(10), 1021–32.

42 

Cheng, M.Y. and Roy, A.F.V. 2011. Evolutionary fuzzy decision model for cash flow prediction using time-dependent support machines. International Journal of Project Management, 29(1), 56–65.

43 

Cheng, Y.M., Yu, C.H., and Wang, H.T. 2011. Short-Interval Dynamic Forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137, 933–41.

44 

Cicmil, S. and Hodgson, D. 2006. New possibilities for project management theory: A critical engagement. Project Management Journal, 37(3), 111–122.

45 

Clark, C.E. 1961. The greatest of a finite set of random variables. Operations Research, 9, 145–162.

46 

Crowston, W.B. 1971. Models for project management. Sloan Management Review, 12(3), 25–42.

47 

Crowston, W.B. and Thompson, G.L. 1967. Decision CPmml: a method for simultaneous planning, scheduling and control of projects. Operations Research, 15, 407–26.

48 

Crowston, W.B. and Thompson, G.L. 1970. Decision CPmml: network reduction and solution. Operations Research, 21, 435–45.

49 

Curiel, I. 1997. Co-operative Game Theory and Applications: Co-operative Games Arising from Combinatorial Optimization Problems. Boston, MA: Kluwer Academic.

50 

Davis, E.W. 1966. Resource allocation in project network models-A survey. Journal of Industrial Engineering, 17, 177–88.

51 

Dawson, C.W. and Dawson, R.J. 1995. Towards more flexible management of software systems development using metamodels. Software Engineering Journal, 10(3), 79–88.

52 

De la Garza, J.M., Prateapusanond, A., and Ambani, N. 2007. Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133, 836–45.

53 

De la Garza, J.M., Vorster, M.C., and Parving, C.M. 1991. Total float traded as commodity. Journal of Construction Engineering and Management, 716–27.

54 

De, P., Dunne, E.J., Ghosh, J.B., and Wells, C.E. 1995. The discrete time-cost tradeoff problem revisited. European Journal of Operations Research, 81, 225–38.

55 

De, P., Dunne, E.J., Ghosh, J.B., and Wells, C.E. 1997. Complexity of the discrete time-cost tradeoff problem for project networks. Operations Research, 45, 302–6.

56 

Deckro, R.F., Henert, J.E., Verdini, W.A., Grimsrud, P.H., and Venkateswar, S. 1995. Nonlinear time/cost tradeoff models in project management. Computers Industrial Engineering, 28(2), 219–29.

57 

Deng, J.L. 1982. Control problem of grey system. Systems and Control Letter, 1(5), 288–94.

58 

Deng, J.L. 1989. Introduction to grey system theory. Journal of Grey System, 1, 1–24.

59 

Drezner, S.M. and Pristker, A.A.B. 1965. Use of generalized networks in scheduling. In: Depot Scheduling and Control Conference. Rand Corporation, Santa Monica, California, 1–3 December 1964.

60 

Drucker, P. 1974. Management: Tasks, Responsibilities, Practices. New York: Harper & Row.

61 

Dubois, D., Fargier, H., and Galvagnon, V. 2003. On the latest starting times and floats in activity networks with ill-known durations. European Journal of Operations Research, 147, 266–80.

62 

Duckstein, L. and Opricovic, S. (1980). Multiobjective optimization in river basin development. Water Resources Research, 16(1), 14–20.

63 

Dutta, S. and Shekhar, S. 1988. Bond rating: A non-conservative application of neural networks. IEEE International Conference on Neural Networks, New York, vol. II, 443–450.

64 

Eisner, H.A. 1962. A generalized network approach to the planning and scheduling of a research project. Operations Research, 10(1), 115–25.

65 

Elmaghraby, S.E. 1964. An algebra for the analysis of generalized activity networks. Management Science, 10(3), 494–514.

66 

Elmaghraby, S.E. 1977. Activity Networks: Project Planning and Control by Networks Models. New York: Wiley.

67 

Elmaghraby, S.E. 1993. Resource allocation via dynamic programming in activity networks. European Journal of Operations Research, 64, 199–215.

68 

Elmaghraby, S.E. 1995. Activity Nets: A guided tour through some recent developments. European Journal of Operations Research, 82, 383–408.

69 

El-Rayes, K. and Kandil, A. 2005. Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), 477–86.

70 

Estevez-Fernandez, A. 2012. A game theoretical approach to sharing penalties and rewards in projects. European Journal of Operations research, 216, 647–57.

71 

Fong, P.S.W. and Choi, S.K.Y. 2000. Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18(5), 547–57.

72 

Ford, L.K. and Fulkerson, D.K. 1962. Flows in Networks. Princeton: University Press.

73 

Fulkerson, D.R. 1961. A network flow computation for project cost curves. Management Science, 7, 167–78.

74 

Galbraith, J.K. 1985. The New Industrial State. Boston: Houghton Mifflin.

75 

Gallant, S. 1988. Connectionist expert systems. Communications, 31(2), 152–69.

76 

Gessford, G.N. 1966. An investigation of the utility of critical path time and cost analysis as an aid to budgeting and administrative control by construction firms. PhD thesis. University of California.

77 

Golenko-Ginzburg, D. 1972. Statistical Methods in Network Planning and Control. Moscow: Nauka (in German).

78 

Golenko-Ginzburg, D. 1988. Controlled alternative activity networks in project management. European Journal of Operations Research, 37, 336–46.

79 

Golenko-Ginzburg, D. 1993. A two-level decision-making model for controlling stochastic projects. International Journal of Production Economics, 32, 117–27.

80 

Golenko-Ginzburg, D. and Blokh, D.A. 1997. A generalized activity network model. Journal of the Operations Research Society, 48, 148–63.

81 

Golenko-Ginzburg, D., Gonik, A., and Kesler, S. 1996. Hierarchical decision-making model for planning and controlling stochastic projects. International Journal of Production Economics, 46–47, 39–54.

82 

Golenko-Ginzburg, D., Kesler, S.S., and Livshift, S.E. 1997. Statistical Modeling in Project Management. Leningrad: Leningrad University Press (in Russian).

83 

Gong, D. 1997. Optimization of float use in risk-based network scheduling. International Journal of Project Management, 15(3), 187–92.

84 

Grubbs, F.F. 1962. Attempts to validate certain PERT Statistics, or: Picking on “PERT”. Operations Research, 10, 912–15.

85 

Hannan, E.L. 1978. The application of Goal Programming techniques to the CPM problem. Socio Economic Planning Sciences, 12, 267–270.

86 

Hartley, H.D. and Wotham, A.W. 1966. A statistical theory for “PERT” critical path analysis. Management Science, 12, 469–81.

87 

Hasting, M.A. and Mello, J.M. 1979. Decision Networks. New York: Wiley.

88 

Hatush, Z. and Skitmore, M. 1997. Criteria for contractor selection. Construction Management and Economics, 15(1), 19–38.

89 

Haykin, S. 1999. Neural Networks: A Comprehensive Foundation. New Jersey: Prenctice-Hall.

90 

Hertz, D.B. 1979. Risk analysis in capital investment. Harvard Business Review, 57(5), 169–81.

91 

Hespos, R.F. and Strassman, P.A. 1965. Stochastic decision trees for the analysis of investment decisions. Management Science, B11, 244–59.

92 

Hillier, F.S. and Lieberman, G.J. 2001. Introduction to Operations Research. Seventh ed., Singapore: McGraw-Hill.

93 

Hinderlang, T.J. and Muth, J.F. 1979. A dynamic programming algorithm for decision-CPM networks. Operations Research, 27, 225–41.

94 

Householder, J.L. and Rutland, H.E. 1990. Who owns float? Journal of Construction Engineering and Management, 116(1), 130–33.

95 

Hwang, C.L. and Yoon, K. 1981. Multiple Attribute Decision Making: Methods and Applications. New York: Springer-Verlag.

96 

Hwee, N.G. and Tiong, R.L. 2002. Model of cash flow forecasting and risk analysis for contracting firms. International Journal of Project Management, 20(5), 351–63.

97 

Ireland, V. 1983. The role of managerial actions in the cost, time and quality performance of high rise commercial building projects. PhD thesis. University of Sydney, Australia.

98 

Kaka, A.P. 1999. The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(3), 256–66.

99 

Kaka, A.P. and Price, A.D.F. 1993. Modeling standard cost commitment curves for contractors’ cash flow forecasting. Construction Management and Economics, ASCE, 11, 271–83.

100 

Kamarthi, S.V., Sanvido, V.E., and Kumara, R.T. 1992. Neuroform-Neural network system for vertical formwork selection. Journal of Computing in Civil Engineering, 6(2), 178–99.

101 

Kandathil, G.M. 2003. Prediction of spacecraft project duration: Adaptation of Markoff Chain analysis. Journal of Spacecraft Technology, 13(1), 1–10.

102 

Kaufmann, A. 1975. Introduction to the Theory of Fuzzy Subsets. Vol. 1: Fundamentals Theoretical Elements. New York: Academic Press.

103 

Keeney, R.L. and Raiffa, H. 1976. Decisions with Multiple Objectives: Preferences and Value Tradeoffs. New York: Wiley.

104 

Keeney, R.L. and Raiffa, H. 1993. Decisions with Multiple Objectives: Preferences and Value Tradeoffs. Cambridge and New York: Cambridge University Press.

105 

Kelley, J.E. and Walker, M.R. 1959a. Critical path planning and scheduling. In: Eastern Joint Computer Conference, 1–3 December 1959. Boston.

106 

Kelley, J.E. and Walker, M.R. 1959b. Critical Path Planning and Scheduling-an Introduction. Ampler, Pennsylvania: Mauchly Associates.

107 

Kelly, J.E. 1961. Critical path planning and scheduling. Mathematical Basis. Operations Research, 9, 296–320.

108 

Kenley, R. and Wilson, O.D. 1986. A construction project cash flow model. An ideographic approach. Construction Management and Economics, ASCE, 4, 213–32.

109 

Kidd, J.B. 1990. Project management software-are we being over-performed? International Journal of Project Management, 8(2), 109–15.

110 

Kidd, J.B. 1991. Do today’s projects need powerful network planning tools? International Journal of Production Research, 29(10), 1969–78.

111 

Kim, B.C. 2007. Forecasting project progress and early warnings of project overruns with probabilistic methods. PhD thesis. University of Texas.

112 

Ko, C.H. and Cheng, M.Y. 2007. Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), 316–24.

113 

Kolisch, R. 1999. Resource allocation capabilities of commercial project management software packages. Interfaces, 29(4), 19–31.

114 

Kutcha, D. 2001. Use of fuzzy numbers in project risk (criticality) assessment. International Journal of Project Management, 19, 305–10.

115 

Lambropoulos, S. 2007. The use of time and cost utility for construction contract award under European Union legislation. Building and Environment, 42(1), 452–63.

116 

Lee, S.M., Moeller, G.L., and Digman, L.D. 1981. Network Analysis for Management Decisions. Boston: Kluwer-Nijhoff.

117 

Lerner, A.Y. 1990. Artificial blood circulation: stabilization, physiological control and optimization. Artificial Organs, 14(2), 110–17.

118 

Levine, H.A. 1986. Project Management using Microcomputers. Berkeley, CA: Osbourne, McGraw-Hill.

119 

Lewis, C.D. 1982. Industrial and Business Forecasting Methods: A Practical Guide to Exponential Smoothing and Curve Fitting. London: Butterworth Scientific.

120 

Liberatore, M.J. and Pollack-Johnson, B. 2006. Extending project time-cost analysis by removing precedence relationships and task streaming. International Journal of Project Management, 24(6), 529–35.

121 

Lin, M.C., Tserng, H.P., Ho, S.P., and Young, D.L. 2012. A novel dynamic progress forecasting approach for construction projects. Expert Systems with Applications, 39, 2247–55.

122 

Lindo Systems, 2002. Lingo version Lindow32. Chicago.

123 

MacCrimmon, K.R. and Ryavec, C.A. 1962. An analytical study of the PERT assumptions. Operations Research, 12, 16–37.

124 

MacCrimmon, K.R. and Ryavec, C.A. 1964. An analytical study of the PERT assumptions. Rand Memorandum RM-3408-PR.

125 

Madhi, L., Riley, M., Fereig, S., and Alex, A. 2002. A multi-criteria approach to contractor selection. Engineering Construction and Architectural Management, 9(1), 29–37.

126 

Malcolm, D.G. 1963. Reliability maturity index (RMI) An extension of PERT into reliability management. Journal of Industrial Engineering, 14, 3–12.

127 

Malcolm, D.G., Roseboom, J.H., Clark, C.E., and Fazar, W. 1959. Application of a technique for research and development program evaluation. Operations Research, 7, 646–69.

128 

Mao, M. and Chirwa, E.C. 2006. Application of grey model GM (1,1) to vehicle fatality risk estimation. Technological Forecasting and Social Change, 73, 588–605.

129 

Maravas, A. and Pantouvakis, J.P. 2012. Project cash flow analysis in the presence of uncertainty in activity duration and cost. Journal of Project Management, 30(3), 374–84.

130 

Mavrotas, G., Caloghirou, Y., and Koune, J. 2005. A model on cash flow forecasting and early warning for multi-project programs: application to the operational program for the information society in Greece. International Journal of Project Management, 23(2), 121–23.

131 

Mawby, D. and Stupples, D. 2002. Systems thinking for managing projects. In. IEMC-2002: IEEE International Engineering Management Conference, vols, I and II, 344–49. Piscataway, New Jersey.

132 

McGartland, M.R. and Hendrickson, C.T. 1985. Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), 293–307.

133 

Microsoft (2007), Computer software.

134 

Miskawi, Z. 1989. An S-curve equation for project control. Construction Management and Economics, ASCE, 7, 115–24.

135 

Moder, J.J. and Philips, C.R. 1964. Project Management with CPM and PERT. New York: Reinhold.

136 

Moder, J.J., Philips, C.R., and Davis, E.W. 1983. Project Management with CPM, PERT, and Precedence Diagramming. 3rd ed. New York: Van Nostrand Reinhold Company.

137 

Moeller, J.J. 1972. VERT, Technical papers: Twenty-third Institute Conference and Convention. Anaheim, California, 31 May–3 June 1972. American Institute of Industrial Engineers. Moeller, G.L. and Digman, L.A. 1981. Operations Planning with VERT. Operations Research, 29(4), 676–97.

138 

Mons, D.L., Cheng, C.H., and Lu, H.C. 1995. Application of fuzzy distributions on project management. Fuzzy Sets and Systems, 73, 227–34.

139 

Moore, L.J. and Clayton, E.R. 1976. GERT Modeling and Simulation: Fundamentals and Applications. New York: Petrocelli-Charter.

140 

Moore, L.J. and Taylor, B.W. 1977. Multiteam, multiproject research and development planning with GERT. Management Science, 24(4), 401–10.

141 

Moore, L.J., Taylor, B.W., Clayton, E.R., and Lee, S.M. 1978. Analysis of a multicriteria project crashing model. AIIE Transaction, 10(2), 164–69.

142 

Moselhi, O., Hegazy, T., and Fazio, P. 1991. Neural networks as tools in construction. Journal of Construction Engineering and Management, 117(4), 606–625.

143 

Murray, J.E. 1963. Considerations of PERT assumptions. IEEE Transactions on Engineering Management, 10, 94–99.

144 

Myerson, R.B. 1991. Game Theory: Analysis of Conflict. Cambridge, MA: Harvard University Press.

145 

Odeh, A.M. and Battaineh, T. 2002. Causes of construction delay: traditional contracts. International Journal of Project Management, 20, 67–76.

146 

Office of the Secretary of Defence and the National Aeronautics and Space Administration, 1962. DOD/NASA Guide to PERT/COST Systems Design, June.

147 

Opricovic, S. and Tzeng, G.H. 2004. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. European Journal of Operations Research, 156(2), 445–55.

148 

Panagiotakopoulos, D. 1977. A CPM time-cost computational algorithm for arbitrary activity cost functions. INFOR, 15, 183–95.

149 

Pao, Y.H. 1989. Adaptive Pattern Recognition and Neural Networks. Reading, Mass: Addison-Wesley Publishing Co.

150 

Pohekar, S.D. and Ramachandran, M. 2004. Application of multi-criteria decision making to sustainable energy planning-A Review. Renewable and Sustainable Energy Reviews, 8, 365–381.

151 

Pollack-Johnson, B. 1995. Hybrid structures and improving forecasting and scheduling in project management. Journal of Operations Management, 12, 101–17.

152 

Ponce de León, G. 1984. Schedule submittals: to approve or not to approve. Strategem, 2(1), 1–12.

153 

Pritsker, A.A.B. 1966. GERT: Graphical Evaluation and Review Technique. Memorandum RM-4973-NASA, the RAND Corporation, Santa Monica, California.

154 

Pritsker, A.A.B. 1979. Modeling and Analysis using Q-GERT Networks. 2nd ed. New York: John Wiley/Halsted Press.

155 

Pritsker, A.A.B. and Happ, W. 1966. GERT: Graphical evaluation and review technique. Part 1. Fundamentals. Journal of Industrial Engineering, 17, 267–74.

156 

Pritsker, A.A.B. and Whitehouse, G.E. 1966. GERT: graphical evaluation and review technique. Part II. Probabilistic and industrial engineering applications. Journal of Industrial Engineering, 17(6), 293–300.

157 

Project Management Institute (PMI). 2004. A Guide to Project Management Body of Knowledge, 3rd ed. Pennsylvania: Project Management Institute, Inc.

158 

Rajagopalan, S. 1994. Capacity expansion with alternative technology choices. European Journal of Operations Research, 77, 392–403.

159 

Raz, T. and Marshall, B. 1996. Effects of resource constraints on float calculations in project networks. International Journal of Project Management, 14(4), 241–48.

160 

Robinson, D.R. 1975. A dynamic programming solution to cost-time tradeoff for CPM. Management Science, 22, 158–66.

161 

Rommelfanger, H.J. 1994. Network analysis and information flow in fuzzy environment. Fuzzy Sets and Systems, 67, 119–28.

162 

Roy, B. 1964. Les problèmes d’ordonnancement. Paris: Dunod.

163 

Saaty, T.L. 2000. Fundamentals of Decision Making and Priority Theory with AHP. Pittsburgh: RWS Publications.

164 

Samli, A.C. and Bellas, C. 1971. The use of GERT in the planning and control of marketing research. Journal of Marketing Research, 8, 335–39.

165 

San Cristóbal, J.R. 2009. Time, Cost, and Quality in a road building project. Journal of Construction Engineering and Management, 135(11), 1271–74.

166 

Shamblin, J.E. and Stevens G.T. 1974. Operations Research: A Fundamental Approach. Bogota: McGraw-Hill.

167 

Shankar, N.R., Sireesha, V., Rao, K., and Vani, N. 2010. Fuzzy critical path method based on metric distance ranking of fuzzy numbers. International Journal of Mathematical Analysis, 4(20), 995–1006.

168 

Shapley, L.S. 1953. A value for n-person Games. Annals of Mathematical Studies, 28, 307–17.

169 

Simon, M.A. 1977. The New Science of the Management Decision. New York: Prentice-Hall.

170 

Skitmore, M. 1998. A method for forecasting owner monthly construction project expenditure flow. Journal of Forecasting, 14, 17–34.

171 

Slyeptsov, A.L. and Tsyhchuk, T.A. 2003. Fuzzy temporal characteristics of operations for project management on the network model basis. European Journal of Operations Research, 147, 253–65.

172 

Spooner, J.E. 1974. Probabilistic estimating. Journal of the Construction Division, 100, 65–77.

173 

Stacey, R. 2001. Complex Responsive Processes in Organisations: Learning and Knowledge Creation. London: Routledge.

174 

Stewart, R. and Mohamed, S. 2002. IT/IS project selection using multi-criteria utility theory. Logistics Information Management, 15(4), 254–70.

175 

Stumpf, G.R. 2000. Schedule delay analysis. Cost Engineering, 42(7), 32–43.

176 

Taha, H.A. 2003. Operations Research: An Introduction. Seventh ed., New Jersey: Prentice-Hall.

177 

Tavares, L.V. 2002. A review of the contribution of operational research to project management. European Journal of Operations Research, 136, 1–18.

178 

Taylor, B.W. and Moore, L.J. 1980. R&D project planning with Q-GERT network modelling and simulation. Management Science, 26(1), 44–59.

179 

Tijs, S.H. and Driessen, T.S.H. 1986. Game theory and cost allocation problems. Management Science, 32(8), 1015–28.

180 

Topcu, Y.L. 2004. A decision model proposal for construction contractor selection in Turkey. Building and Environment, 39(4), 469–81.

181 

Tuker, S.N. 1988. A single alternative formula for Department of Health and Social Security S-curves. Construction Management and Economics, ASCE, 6, 13–23.

182 

Voropajev, V.I., Ljubkin, S.M., and Golenko-Ginzburg, D.A. 1997. A model approach in reducing uncertainty and risk in project management. Professional Magazine of PM Association Finland, 3(1), 40–43.

183 

Voropajev, V.I., Ljubkin, S.M., Titarenko, B.P., and Golenko-Ginzburg, D. 2000. Structural classification of network models. International Journal of Project Management, 18, 361–68.

184 

Vrat, P. and Kriengkrairut, C. 1986. A goal programming model for project crashing with piecewise linear time-cost trade-off. Engineering Costs and Production Economics, 10, 161–72.

185 

Wassermann, P.D. 1989. Neural Computing: Theory and Practice. New York: Van Nostrand-Reinhold.

186 

Whitehouse, G.E. 1973. Systems Analysis and Design using Network Techniques. New Jersey: Prentice-Hall, Englewood Cliffs.

187 

Whitehouse, G.E. and Pritsker, A.A.B. 1969. GERT, Part III: Generating functions, conditional distributions, counters, renewal times and correlations. AIIE Transaction, 1(1), 45–56.

188 

Winston, W.L. 2003. Operations Research: Applications & Algorithms. 4th ed. Thomson Business Press.

189 

Wood, M. 2002. Mind the gap? A processual reconsideration of organizational knowledge. Organization, 9(1), 151–71.

190 

Wu, L., Liu, S., and Wang, Y. 2012. Grey Lotka-Volterra model and its applications. Technological Forecasting and Social Change, 79, 1720–30.

191 

Yu, P.L. 1973. A class of solutions for group decision problems. Management Science, 19(8), 936–46.

192 

Zadeh, L.A. 1978. Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems, 1, 3–28.

193 

Zamori, F.A., Braglia, M., and Frosolini, M. 2007. A fuzzy multi-criteria approach for critical path definition. International Journal of Project Management, 27, 278–91.

194 

Zamori, F.A., Braglia, M., and Frosolini, M. 2009. A fuzzy multi-criteria approach for critical path definition. International Journal of Project Management, 27(3), 278–91.

195 

Zeleny, M. 1982. Multiple Criteria Decision Making. New York: McGraw-Hill.

196 

Zielinski, P. 2005. On computing the latest starting times and floats of activities in a network with imprecise durations. Fuzzy Sets and Systems, 150, 53–76.

197 

Zimmermann, H.J. 1984. Fuzzy Sets and Decision Analysis (TIMS/Studies in the Management Sciences). Amsterdam: North-Holland, Elsevier.

198 

Zimmermann, H.J. 2001. Fuzzy Set Theory and its Applications. Boston: Kluwer Nijhoff.

Submit your own content for publication

Submit content