GPM First
From Management Science, Operations Research and Project Management (978-1-4724-2643-7) by José Ramón San Cristóbal Mateo




Abdul-Raman, H., Yahya, I.A., Berawi, M.A., and Wah, L.W. 2008. Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), 15–27.


AbouRizk, S. 2010. Role of simulation in construction engineering and management. Journal of Construction Engineering and Management, 136(10), 1140–53.


Ackoff, R.L. 1970. A Concept of Corporate Planning. New York: Wiley.


Ahmad, I. and Minkarah, I. 1990. Decision analysis and expert system technology: A construction industry perspective. Proc., Int. Sym. On Building Economics and Construction Management, CIB, Sydney, Australia, 363–372.


Aibinu, A.A. and Jagboro, G.O. 2002. The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20, 593–99.


Aibinu, A.A. and Odeyinka, H.A. 2005. Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132, 667–77.


Alaghbari, W., Kadir, M.R.A., Salim, A., and Ernawati. A. 2007. The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206.


Al-Gahtani, K.S. 2009. Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135, 88–95.


Al-Subhi Al-Harbi, K. 2001. Application of the AHP in project management. International Journal of Project Management, 19, 19–27.


Amiri, M. and Golozari, F. 2011. Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk and quality criteria. International Journal of Advanced Manufacturing Technology, 54(1–4), 393–401.


Ang, A.H. and Tang, W.H. 1975. Probability Concepts in Engineering and Design. New York: John Wiley & Sons.


Association for Project Management (APM). 2006. Body of Knowledge, 5th ed. High Wycombe: Project Management Institute.


Azaron, A. and Tavakkoli-Moghaddam, R. 2006. A multi-objective resource allocation problem in dynamic PERT networks. Applied Mathematics and Computation, 181(1), 163–74.


Barraza, G.A., Back, W.E., and Mata, F. 2000. Probabilistic monitoring of project performance using S-curves. Journal of Construction Engineering and Management, 126(2), 142–48.


Barraza, G.A., Back, W.E., and Mata, F. 2004. Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), 25–32.


Bein, W.W., Kamburowski, J., and Stallmann, M.F.M. 1992. Optimal reduction of two-terminal directed acyclic graphs. SLAM Journal of Computing, 21, 1112–29.


Bell, D.V., Keeney, R., and Raiffa, H. 1978. Conflicting Objectives in Decisions. New York: International Institute for Applied Systems Analysis.


Bellas, C.J. and Samli, A.C. 1973. Improving new product planning with GERT simulation. California Management Review, 15(4), 14–21.


Bergantinos, G. and Sanchez, E. 2002a. How to distribute costs associated with a delayed project. Annals of Operations Research, 109, 159–74.


Bergantinos, G. and Sanchez, E. 2002b. NTU PERT Games. Operations Research Letters, 30, 130–40.


Berny. J. and Howes, R. 1982. Project management control using real-time budgeting and forecasting models. Construction Papers, 2(1), 19–40.


Blyth, K. and Kaka, A. 2006. A novel multiple linear regression model for forecasting S-curves. Engineering, Construction, and Architectural Management, 13(1), 82–95.


Brans, J.P. 1982. L’ingénierie de la décision: élaboration d›instruments d’aide à la décision. Le méthode PROMETHEE. Colloque d’aide à la decision. Quebec, 183–213.


Brans, J.P. and Vincke, P.H. 1985. A preference ranking organization method: The PROMETHEE method for multiple-criteria decision-making. Management Science, 31(6), 647–56.


Branzei, R., Ferrari, G., Fragnelli, V., and Tijs, S. 2002. Fuzzy temporal characteristics of operations for project management on the network models basis. Annals of Operational Research, 109, 359–74.


British Standard (BS 6079-1). 2002. Guide to Project Management. London: British Standards Institutions.


Bromilow, F.J. 1974. Measurement and scheduling of construction time and cost performance in the building industry. The Chartered Builder, 10(9), 189–96.


Butcher, W.S. 1967. Dynamic programming for project cost-time curves. Journal of the Construction Division, Proceedings of the ASCE, 93, 59–73.


Cagno, E., Caron, F., and Perego, A. 2001. Multi-criteria assessment of the probability of winning in the competitive bidding process. International Journal of Project Management, 19(6), 313–24.


Castelaz, P., Angus, J., and Mahoney, J. 1987. Appliction of neural networks to expert systems and command and control systems. Proc., IEEE Western Conference on Expert Systems, 118–125.


Castro, J., Gómez, D. and Tejada, J. 2012. A project game for PERT networks. Operations Research Letters, 35, 791–98.


Chan, A.P.C. 1999. Modeling building durations in Hong Kong. Construction Management and Economics, 17(2), 189–96.


Chanas, S. and Zielinski, P. 2003. On the hardness of evaluating criticality of activities in a planar network with duration intervals. Operations Research Letters, 31, 53–59.


Chanas, S., Dubois, D., and Zielinski, P. 2002. On the sure criticality of tasks in activity networks with imprecise durations. IEEE Transactions on Systems, Man and Cybernetics, Part B, 32, 393–407.


Chao, L.C. and Chien, C.F. 2009. Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), 169–77.


Chao, L.C. and Skibniewski, J.M. 1994. Estimating construction productivity: Neural-network-based approach. Journal of Computing and Civil Engineering, 8(2), 234–51.


Charnes, A. and Cooper, W.W. 1962. A network interpretation and a directed subdual algorithm for critical path scheduling. Journal of Industrial Engineering, 13(4), 213–19.


Chen, H.L., Chen, C.I., Liu, C.H., and Wei, N.C. 2013. Estimating a project’s profitability: A longitudinal approach. International Journal of Project Management, 31, 400–10.


Chen, S.F. 2007. Analysis of critical paths in a project network with fuzzy activity times. European Journal of Operations Research, 183, 442–59.


Chen, S.P. and Hsueh, Y.J. 2008. A simple approach to fuzzy critical path analysis in project networks. Applied Mathematical. Modeling, 32, 1289–97.


Cheng, E.W.L. and Li, H. 2004. Contractor selection using the analytical network process. Construction Management and Economics, 22(10), 1021–32.


Cheng, M.Y. and Roy, A.F.V. 2011. Evolutionary fuzzy decision model for cash flow prediction using time-dependent support machines. International Journal of Project Management, 29(1), 56–65.


Cheng, Y.M., Yu, C.H., and Wang, H.T. 2011. Short-Interval Dynamic Forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137, 933–41.


Cicmil, S. and Hodgson, D. 2006. New possibilities for project management theory: A critical engagement. Project Management Journal, 37(3), 111–122.


Clark, C.E. 1961. The greatest of a finite set of random variables. Operations Research, 9, 145–162.


Crowston, W.B. 1971. Models for project management. Sloan Management Review, 12(3), 25–42.


Crowston, W.B. and Thompson, G.L. 1967. Decision CPmml: a method for simultaneous planning, scheduling and control of projects. Operations Research, 15, 407–26.


Crowston, W.B. and Thompson, G.L. 1970. Decision CPmml: network reduction and solution. Operations Research, 21, 435–45.


Curiel, I. 1997. Co-operative Game Theory and Applications: Co-operative Games Arising from Combinatorial Optimization Problems. Boston, MA: Kluwer Academic.


Davis, E.W. 1966. Resource allocation in project network models-A survey. Journal of Industrial Engineering, 17, 177–88.


Dawson, C.W. and Dawson, R.J. 1995. Towards more flexible management of software systems development using metamodels. Software Engineering Journal, 10(3), 79–88.


De la Garza, J.M., Prateapusanond, A., and Ambani, N. 2007. Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133, 836–45.


De la Garza, J.M., Vorster, M.C., and Parving, C.M. 1991. Total float traded as commodity. Journal of Construction Engineering and Management, 716–27.


De, P., Dunne, E.J., Ghosh, J.B., and Wells, C.E. 1995. The discrete time-cost tradeoff problem revisited. European Journal of Operations Research, 81, 225–38.


De, P., Dunne, E.J., Ghosh, J.B., and Wells, C.E. 1997. Complexity of the discrete time-cost tradeoff problem for project networks. Operations Research, 45, 302–6.


Deckro, R.F., Henert, J.E., Verdini, W.A., Grimsrud, P.H., and Venkateswar, S. 1995. Nonlinear time/cost tradeoff models in project management. Computers Industrial Engineering, 28(2), 219–29.


Deng, J.L. 1982. Control problem of grey system. Systems and Control Letter, 1(5), 288–94.


Deng, J.L. 1989. Introduction to grey system theory. Journal of Grey System, 1, 1–24.


Drezner, S.M. and Pristker, A.A.B. 1965. Use of generalized networks in scheduling. In: Depot Scheduling and Control Conference. Rand Corporation, Santa Monica, California, 1–3 December 1964.


Drucker, P. 1974. Management: Tasks, Responsibilities, Practices. New York: Harper & Row.


Dubois, D., Fargier, H., and Galvagnon, V. 2003. On the latest starting times and floats in activity networks with ill-known durations. European Journal of Operations Research, 147, 266–80.


Duckstein, L. and Opricovic, S. (1980). Multiobjective optimization in river basin development. Water Resources Research, 16(1), 14–20.


Dutta, S. and Shekhar, S. 1988. Bond rating: A non-conservative application of neural networks. IEEE International Conference on Neural Networks, New York, vol. II, 443–450.


Eisner, H.A. 1962. A generalized network approach to the planning and scheduling of a research project. Operations Research, 10(1), 115–25.


Elmaghraby, S.E. 1964. An algebra for the analysis of generalized activity networks. Management Science, 10(3), 494–514.


Elmaghraby, S.E. 1977. Activity Networks: Project Planning and Control by Networks Models. New York: Wiley.


Elmaghraby, S.E. 1993. Resource allocation via dynamic programming in activity networks. European Journal of Operations Research, 64, 199–215.


Elmaghraby, S.E. 1995. Activity Nets: A guided tour through some recent developments. European Journal of Operations Research, 82, 383–408.


El-Rayes, K. and Kandil, A. 2005. Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), 477–86.


Estevez-Fernandez, A. 2012. A game theoretical approach to sharing penalties and rewards in projects. European Journal of Operations research, 216, 647–57.


Fong, P.S.W. and Choi, S.K.Y. 2000. Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18(5), 547–57.


Ford, L.K. and Fulkerson, D.K. 1962. Flows in Networks. Princeton: University Press.


Fulkerson, D.R. 1961. A network flow computation for project cost curves. Management Science, 7, 167–78.


Galbraith, J.K. 1985. The New Industrial State. Boston: Houghton Mifflin.


Gallant, S. 1988. Connectionist expert systems. Communications, 31(2), 152–69.


Gessford, G.N. 1966. An investigation of the utility of critical path time and cost analysis as an aid to budgeting and administrative control by construction firms. PhD thesis. University of California.


Golenko-Ginzburg, D. 1972. Statistical Methods in Network Planning and Control. Moscow: Nauka (in German).


Golenko-Ginzburg, D. 1988. Controlled alternative activity networks in project management. European Journal of Operations Research, 37, 336–46.


Golenko-Ginzburg, D. 1993. A two-level decision-making model for controlling stochastic projects. International Journal of Production Economics, 32, 117–27.


Golenko-Ginzburg, D. and Blokh, D.A. 1997. A generalized activity network model. Journal of the Operations Research Society, 48, 148–63.


Golenko-Ginzburg, D., Gonik, A., and Kesler, S. 1996. Hierarchical decision-making model for planning and controlling stochastic projects. International Journal of Production Economics, 46–47, 39–54.


Golenko-Ginzburg, D., Kesler, S.S., and Livshift, S.E. 1997. Statistical Modeling in Project Management. Leningrad: Leningrad University Press (in Russian).


Gong, D. 1997. Optimization of float use in risk-based network scheduling. International Journal of Project Management, 15(3), 187–92.


Grubbs, F.F. 1962. Attempts to validate certain PERT Statistics, or: Picking on “PERT”. Operations Research, 10, 912–15.


Hannan, E.L. 1978. The application of Goal Programming techniques to the CPM problem. Socio Economic Planning Sciences, 12, 267–270.


Hartley, H.D. and Wotham, A.W. 1966. A statistical theory for “PERT” critical path analysis. Management Science, 12, 469–81.


Hasting, M.A. and Mello, J.M. 1979. Decision Networks. New York: Wiley.


Hatush, Z. and Skitmore, M. 1997. Criteria for contractor selection. Construction Management and Economics, 15(1), 19–38.


Haykin, S. 1999. Neural Networks: A Comprehensive Foundation. New Jersey: Prenctice-Hall.


Hertz, D.B. 1979. Risk analysis in capital investment. Harvard Business Review, 57(5), 169–81.


Hespos, R.F. and Strassman, P.A. 1965. Stochastic decision trees for the analysis of investment decisions. Management Science, B11, 244–59.


Hillier, F.S. and Lieberman, G.J. 2001. Introduction to Operations Research. Seventh ed., Singapore: McGraw-Hill.


Hinderlang, T.J. and Muth, J.F. 1979. A dynamic programming algorithm for decision-CPM networks. Operations Research, 27, 225–41.


Householder, J.L. and Rutland, H.E. 1990. Who owns float? Journal of Construction Engineering and Management, 116(1), 130–33.


Hwang, C.L. and Yoon, K. 1981. Multiple Attribute Decision Making: Methods and Applications. New York: Springer-Verlag.


Hwee, N.G. and Tiong, R.L. 2002. Model of cash flow forecasting and risk analysis for contracting firms. International Journal of Project Management, 20(5), 351–63.


Ireland, V. 1983. The role of managerial actions in the cost, time and quality performance of high rise commercial building projects. PhD thesis. University of Sydney, Australia.


Kaka, A.P. 1999. The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(3), 256–66.


Kaka, A.P. and Price, A.D.F. 1993. Modeling standard cost commitment curves for contractors’ cash flow forecasting. Construction Management and Economics, ASCE, 11, 271–83.


Kamarthi, S.V., Sanvido, V.E., and Kumara, R.T. 1992. Neuroform-Neural network system for vertical formwork selection. Journal of Computing in Civil Engineering, 6(2), 178–99.


Kandathil, G.M. 2003. Prediction of spacecraft project duration: Adaptation of Markoff Chain analysis. Journal of Spacecraft Technology, 13(1), 1–10.


Kaufmann, A. 1975. Introduction to the Theory of Fuzzy Subsets. Vol. 1: Fundamentals Theoretical Elements. New York: Academic Press.


Keeney, R.L. and Raiffa, H. 1976. Decisions with Multiple Objectives: Preferences and Value Tradeoffs. New York: Wiley.


Keeney, R.L. and Raiffa, H. 1993. Decisions with Multiple Objectives: Preferences and Value Tradeoffs. Cambridge and New York: Cambridge University Press.


Kelley, J.E. and Walker, M.R. 1959a. Critical path planning and scheduling. In: Eastern Joint Computer Conference, 1–3 December 1959. Boston.


Kelley, J.E. and Walker, M.R. 1959b. Critical Path Planning and Scheduling-an Introduction. Ampler, Pennsylvania: Mauchly Associates.


Kelly, J.E. 1961. Critical path planning and scheduling. Mathematical Basis. Operations Research, 9, 296–320.


Kenley, R. and Wilson, O.D. 1986. A construction project cash flow model. An ideographic approach. Construction Management and Economics, ASCE, 4, 213–32.


Kidd, J.B. 1990. Project management software-are we being over-performed? International Journal of Project Management, 8(2), 109–15.


Kidd, J.B. 1991. Do today’s projects need powerful network planning tools? International Journal of Production Research, 29(10), 1969–78.


Kim, B.C. 2007. Forecasting project progress and early warnings of project overruns with probabilistic methods. PhD thesis. University of Texas.


Ko, C.H. and Cheng, M.Y. 2007. Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), 316–24.


Kolisch, R. 1999. Resource allocation capabilities of commercial project management software packages. Interfaces, 29(4), 19–31.


Kutcha, D. 2001. Use of fuzzy numbers in project risk (criticality) assessment. International Journal of Project Management, 19, 305–10.


Lambropoulos, S. 2007. The use of time and cost utility for construction contract award under European Union legislation. Building and Environment, 42(1), 452–63.


Lee, S.M., Moeller, G.L., and Digman, L.D. 1981. Network Analysis for Management Decisions. Boston: Kluwer-Nijhoff.


Lerner, A.Y. 1990. Artificial blood circulation: stabilization, physiological control and optimization. Artificial Organs, 14(2), 110–17.


Levine, H.A. 1986. Project Management using Microcomputers. Berkeley, CA: Osbourne, McGraw-Hill.


Lewis, C.D. 1982. Industrial and Business Forecasting Methods: A Practical Guide to Exponential Smoothing and Curve Fitting. London: Butterworth Scientific.


Liberatore, M.J. and Pollack-Johnson, B. 2006. Extending project time-cost analysis by removing precedence relationships and task streaming. International Journal of Project Management, 24(6), 529–35.


Lin, M.C., Tserng, H.P., Ho, S.P., and Young, D.L. 2012. A novel dynamic progress forecasting approach for construction projects. Expert Systems with Applications, 39, 2247–55.


Lindo Systems, 2002. Lingo version Lindow32. Chicago.


MacCrimmon, K.R. and Ryavec, C.A. 1962. An analytical study of the PERT assumptions. Operations Research, 12, 16–37.


MacCrimmon, K.R. and Ryavec, C.A. 1964. An analytical study of the PERT assumptions. Rand Memorandum RM-3408-PR.


Madhi, L., Riley, M., Fereig, S., and Alex, A. 2002. A multi-criteria approach to contractor selection. Engineering Construction and Architectural Management, 9(1), 29–37.


Malcolm, D.G. 1963. Reliability maturity index (RMI) An extension of PERT into reliability management. Journal of Industrial Engineering, 14, 3–12.


Malcolm, D.G., Roseboom, J.H., Clark, C.E., and Fazar, W. 1959. Application of a technique for research and development program evaluation. Operations Research, 7, 646–69.


Mao, M. and Chirwa, E.C. 2006. Application of grey model GM (1,1) to vehicle fatality risk estimation. Technological Forecasting and Social Change, 73, 588–605.


Maravas, A. and Pantouvakis, J.P. 2012. Project cash flow analysis in the presence of uncertainty in activity duration and cost. Journal of Project Management, 30(3), 374–84.


Mavrotas, G., Caloghirou, Y., and Koune, J. 2005. A model on cash flow forecasting and early warning for multi-project programs: application to the operational program for the information society in Greece. International Journal of Project Management, 23(2), 121–23.


Mawby, D. and Stupples, D. 2002. Systems thinking for managing projects. In. IEMC-2002: IEEE International Engineering Management Conference, vols, I and II, 344–49. Piscataway, New Jersey.


McGartland, M.R. and Hendrickson, C.T. 1985. Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), 293–307.


Microsoft (2007), Computer software.


Miskawi, Z. 1989. An S-curve equation for project control. Construction Management and Economics, ASCE, 7, 115–24.


Moder, J.J. and Philips, C.R. 1964. Project Management with CPM and PERT. New York: Reinhold.


Moder, J.J., Philips, C.R., and Davis, E.W. 1983. Project Management with CPM, PERT, and Precedence Diagramming. 3rd ed. New York: Van Nostrand Reinhold Company.


Moeller, J.J. 1972. VERT, Technical papers: Twenty-third Institute Conference and Convention. Anaheim, California, 31 May–3 June 1972. American Institute of Industrial Engineers. Moeller, G.L. and Digman, L.A. 1981. Operations Planning with VERT. Operations Research, 29(4), 676–97.


Mons, D.L., Cheng, C.H., and Lu, H.C. 1995. Application of fuzzy distributions on project management. Fuzzy Sets and Systems, 73, 227–34.


Moore, L.J. and Clayton, E.R. 1976. GERT Modeling and Simulation: Fundamentals and Applications. New York: Petrocelli-Charter.


Moore, L.J. and Taylor, B.W. 1977. Multiteam, multiproject research and development planning with GERT. Management Science, 24(4), 401–10.


Moore, L.J., Taylor, B.W., Clayton, E.R., and Lee, S.M. 1978. Analysis of a multicriteria project crashing model. AIIE Transaction, 10(2), 164–69.


Moselhi, O., Hegazy, T., and Fazio, P. 1991. Neural networks as tools in construction. Journal of Construction Engineering and Management, 117(4), 606–625.


Murray, J.E. 1963. Considerations of PERT assumptions. IEEE Transactions on Engineering Management, 10, 94–99.


Myerson, R.B. 1991. Game Theory: Analysis of Conflict. Cambridge, MA: Harvard University Press.


Odeh, A.M. and Battaineh, T. 2002. Causes of construction delay: traditional contracts. International Journal of Project Management, 20, 67–76.


Office of the Secretary of Defence and the National Aeronautics and Space Administration, 1962. DOD/NASA Guide to PERT/COST Systems Design, June.


Opricovic, S. and Tzeng, G.H. 2004. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. European Journal of Operations Research, 156(2), 445–55.


Panagiotakopoulos, D. 1977. A CPM time-cost computational algorithm for arbitrary activity cost functions. INFOR, 15, 183–95.


Pao, Y.H. 1989. Adaptive Pattern Recognition and Neural Networks. Reading, Mass: Addison-Wesley Publishing Co.


Pohekar, S.D. and Ramachandran, M. 2004. Application of multi-criteria decision making to sustainable energy planning-A Review. Renewable and Sustainable Energy Reviews, 8, 365–381.


Pollack-Johnson, B. 1995. Hybrid structures and improving forecasting and scheduling in project management. Journal of Operations Management, 12, 101–17.


Ponce de León, G. 1984. Schedule submittals: to approve or not to approve. Strategem, 2(1), 1–12.


Pritsker, A.A.B. 1966. GERT: Graphical Evaluation and Review Technique. Memorandum RM-4973-NASA, the RAND Corporation, Santa Monica, California.


Pritsker, A.A.B. 1979. Modeling and Analysis using Q-GERT Networks. 2nd ed. New York: John Wiley/Halsted Press.


Pritsker, A.A.B. and Happ, W. 1966. GERT: Graphical evaluation and review technique. Part 1. Fundamentals. Journal of Industrial Engineering, 17, 267–74.


Pritsker, A.A.B. and Whitehouse, G.E. 1966. GERT: graphical evaluation and review technique. Part II. Probabilistic and industrial engineering applications. Journal of Industrial Engineering, 17(6), 293–300.


Project Management Institute (PMI). 2004. A Guide to Project Management Body of Knowledge, 3rd ed. Pennsylvania: Project Management Institute, Inc.


Rajagopalan, S. 1994. Capacity expansion with alternative technology choices. European Journal of Operations Research, 77, 392–403.


Raz, T. and Marshall, B. 1996. Effects of resource constraints on float calculations in project networks. International Journal of Project Management, 14(4), 241–48.


Robinson, D.R. 1975. A dynamic programming solution to cost-time tradeoff for CPM. Management Science, 22, 158–66.


Rommelfanger, H.J. 1994. Network analysis and information flow in fuzzy environment. Fuzzy Sets and Systems, 67, 119–28.


Roy, B. 1964. Les problèmes d’ordonnancement. Paris: Dunod.


Saaty, T.L. 2000. Fundamentals of Decision Making and Priority Theory with AHP. Pittsburgh: RWS Publications.


Samli, A.C. and Bellas, C. 1971. The use of GERT in the planning and control of marketing research. Journal of Marketing Research, 8, 335–39.


San Cristóbal, J.R. 2009. Time, Cost, and Quality in a road building project. Journal of Construction Engineering and Management, 135(11), 1271–74.


Shamblin, J.E. and Stevens G.T. 1974. Operations Research: A Fundamental Approach. Bogota: McGraw-Hill.


Shankar, N.R., Sireesha, V., Rao, K., and Vani, N. 2010. Fuzzy critical path method based on metric distance ranking of fuzzy numbers. International Journal of Mathematical Analysis, 4(20), 995–1006.


Shapley, L.S. 1953. A value for n-person Games. Annals of Mathematical Studies, 28, 307–17.


Simon, M.A. 1977. The New Science of the Management Decision. New York: Prentice-Hall.


Skitmore, M. 1998. A method for forecasting owner monthly construction project expenditure flow. Journal of Forecasting, 14, 17–34.


Slyeptsov, A.L. and Tsyhchuk, T.A. 2003. Fuzzy temporal characteristics of operations for project management on the network model basis. European Journal of Operations Research, 147, 253–65.


Spooner, J.E. 1974. Probabilistic estimating. Journal of the Construction Division, 100, 65–77.


Stacey, R. 2001. Complex Responsive Processes in Organisations: Learning and Knowledge Creation. London: Routledge.


Stewart, R. and Mohamed, S. 2002. IT/IS project selection using multi-criteria utility theory. Logistics Information Management, 15(4), 254–70.


Stumpf, G.R. 2000. Schedule delay analysis. Cost Engineering, 42(7), 32–43.


Taha, H.A. 2003. Operations Research: An Introduction. Seventh ed., New Jersey: Prentice-Hall.


Tavares, L.V. 2002. A review of the contribution of operational research to project management. European Journal of Operations Research, 136, 1–18.


Taylor, B.W. and Moore, L.J. 1980. R&D project planning with Q-GERT network modelling and simulation. Management Science, 26(1), 44–59.


Tijs, S.H. and Driessen, T.S.H. 1986. Game theory and cost allocation problems. Management Science, 32(8), 1015–28.


Topcu, Y.L. 2004. A decision model proposal for construction contractor selection in Turkey. Building and Environment, 39(4), 469–81.


Tuker, S.N. 1988. A single alternative formula for Department of Health and Social Security S-curves. Construction Management and Economics, ASCE, 6, 13–23.


Voropajev, V.I., Ljubkin, S.M., and Golenko-Ginzburg, D.A. 1997. A model approach in reducing uncertainty and risk in project management. Professional Magazine of PM Association Finland, 3(1), 40–43.


Voropajev, V.I., Ljubkin, S.M., Titarenko, B.P., and Golenko-Ginzburg, D. 2000. Structural classification of network models. International Journal of Project Management, 18, 361–68.


Vrat, P. and Kriengkrairut, C. 1986. A goal programming model for project crashing with piecewise linear time-cost trade-off. Engineering Costs and Production Economics, 10, 161–72.


Wassermann, P.D. 1989. Neural Computing: Theory and Practice. New York: Van Nostrand-Reinhold.


Whitehouse, G.E. 1973. Systems Analysis and Design using Network Techniques. New Jersey: Prentice-Hall, Englewood Cliffs.


Whitehouse, G.E. and Pritsker, A.A.B. 1969. GERT, Part III: Generating functions, conditional distributions, counters, renewal times and correlations. AIIE Transaction, 1(1), 45–56.


Winston, W.L. 2003. Operations Research: Applications & Algorithms. 4th ed. Thomson Business Press.


Wood, M. 2002. Mind the gap? A processual reconsideration of organizational knowledge. Organization, 9(1), 151–71.


Wu, L., Liu, S., and Wang, Y. 2012. Grey Lotka-Volterra model and its applications. Technological Forecasting and Social Change, 79, 1720–30.


Yu, P.L. 1973. A class of solutions for group decision problems. Management Science, 19(8), 936–46.


Zadeh, L.A. 1978. Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems, 1, 3–28.


Zamori, F.A., Braglia, M., and Frosolini, M. 2007. A fuzzy multi-criteria approach for critical path definition. International Journal of Project Management, 27, 278–91.


Zamori, F.A., Braglia, M., and Frosolini, M. 2009. A fuzzy multi-criteria approach for critical path definition. International Journal of Project Management, 27(3), 278–91.


Zeleny, M. 1982. Multiple Criteria Decision Making. New York: McGraw-Hill.


Zielinski, P. 2005. On computing the latest starting times and floats of activities in a network with imprecise durations. Fuzzy Sets and Systems, 150, 53–76.


Zimmermann, H.J. 1984. Fuzzy Sets and Decision Analysis (TIMS/Studies in the Management Sciences). Amsterdam: North-Holland, Elsevier.


Zimmermann, H.J. 2001. Fuzzy Set Theory and its Applications. Boston: Kluwer Nijhoff.

Submit your own content for publication

Submit content